An image of the sculpture before deinstallation and treatment
City Lights Neon performs a test run of the neon tubes at the McKay Lodge Conservation lab facilities outside of Cleveland
Special crates were made to transport the delicate neon tubes
The initial test is a success, the artwork is ready to transport and install
The last panel is installed onsite in Dayton
McKay Lodge Conservation assist as City Neon Lights carefully install the neon tubes
Final connections are made by City Lights Neon
After treatment, the red neons glow once more against the blue background of the artwork